Avant Townhomes at Kinley!

Avant Townhomes a subsidiary of Intrapac Property, the developer of the ex. Lilydale quarry, has launched at Kinley. Developed in response to a market need for smarter, smaller and more energy efficient dwellings, the Templar Lane release in Kinley’s first stage off Hull Road features 16 architect designed townhomes and apartments.

Designed with straightforward strong forms and minimalist quality detailing to suit the urban location, this first release offers modern façades with sleek material-based colours whilst brick and masonry materials recognise the earthy history of the site.

The Templar Lane release occupies the enviable position overlooking the wetlands reserve with distant views to the iconic Dandenong Ranges and many of the homes benefiting from private, north-west facing balconies and courtyards.

With designs to suit every life stage – from first home buyers to families and retirees wanting to downsize. Two and three-bedroom options are available with top floor, ground floor, two or three storey designs, with a range of external facades.

Another sell out at Kinley

The pent-up demand in the Melbourne housing market was reflected when Kinley’s third tranche of housing lots was released in late March 2021. The Hilltop Release accessed via a first-in-first-served online booking system, 35 appointments were made in minutes and all 33 available lots sold out on the weekend of the release. Kinley is planned […]

Avant Townhomes – sold out! New release coming soon…

With the carefully considered architectural design and superior location benefits, it’s no surprise the first release of Avant Townhomes within Kinley has sold out. With such overwhelming demand, we are pleased to announce a new limited release of the Avant Townhomes will be available soon. Register here to be one of the first notified.

Retaining walls under construction at Kinley!

We are excited to watch Kinley’s impressive Hull Road entry statement get underway. The Kinley feature rock walls are being constructed using rocks sourced from the original David Mitchell Quarry. Rocks are sourced and sorted from within the overburden which was originally removed and is now being utilised to backfill the quarry. Utilising and maximising […]